Vitzro Nextech

비츠로넥스텍

Last verified · JSON

Name
Vitzro Nextech
Local name
비츠로넥스텍
Legal name
Vitzro Nextech Co., LTD
Legal name (local)
주식회사 비츠로넥스텍
Business reg. no.
870-81-00451
Website
http://www.vitzronextech.com
Founded
2016-08-30
Headquarters
Ansan, Gyeonggi
Contact (general)
+82-31-450-8654
Contact (general)
vitzronxt@vitzrotech.com
Summary
KOSDAQ-listed company, established in August 2016 through a physical split-off of the special business division of Vitzro Tech (비츠로테크), that researches and manufactures parts and systems in four business areas: aerospace (combustion chambers, gas generators, turbine exhaust parts and cryogenic flexible lines for the engines of the Korean launch vehicle Nuri, KSLV-II), fusion energy (plasma-facing and heating components for KSTAR and ITER), particle accelerators, and plasma systems. Its largest shareholder is Vitzro Tech, and it belongs to the Vitzro Group business group.
Sectors
Space, Launch vehicles, Aerospace components, Fusion energy, Particle accelerators, Plasma technology
Industry
Aerospace, Space & Defense, Energy & Climate
Technologies: Space technology
Editorial classification by QED Index, taxonomy 1.1.0 (how), based on:
KSIC (rev. 11)
31322 항공기용 부품 제조업
ISIC Rev.4
3030 Manufacture of air and spacecraft and related machinery · derived from the official concordance table
CEO
이병호
Headcount
210 (National Pension Service enrollees, 2026-10)
Monthly history
MonthCount
2025-11218
2025-12213
2025-12-31281
2026-01212
2026-02212
2026-03213
2026-04206
2026-05207
2026-06208
2026-07205
2026-08205
2026-09208
2026-10210
Funding round
Initial public offering on KOSDAQ (new shares, public offering), 2025-11-14, KRW 30,360,000,000
Product
Launch vehicle engine components · Aerospace
Combustion chambers, gas generators, turbine exhaust parts and high-pressure flexible lines for the 1st, 2nd and 3rd stage engines of the Korean launch vehicle Nuri (KSLV-II), and construction of launch test facilities. The company's filing lists engine component deliveries for the Nuri launches of October 2021, June 2022 and May 2023.
Product
Fusion reactor components · Fusion energy
Plasma-facing units (tungsten monoblock modules and divertors) and heating systems (ICRF and NBI) for KSTAR, and ITER parts including in-vessel vertical stability coils, busbars, a diagnostic first wall and lower-port electrical feedthroughs.
Product
Particle accelerator components · Particle accelerators
Accelerating structures, waveguides and couplers for proton, heavy-ion and synchrotron radiation accelerators, supplied to projects including PLS-II, PAL-XFEL and RAON.
Product
Plasma systems · Plasma technology
High-temperature plasma wind tunnel test equipment, plasma melting facilities, waste plastic pyrolysis equipment, valuable metal recovery from spent catalysts, radioactive waste volume reduction equipment and plasma carbonization equipment for organic waste.
Product
Cryogenic equipment · Cryogenics
Cryogenic valve boxes, cryogenic accelerator tube chambers and cryogenic distribution boxes.
Partnership
Korea Institute of Fusion Energy (한국핵융합에너지연구원) · 2025-12-26
Supply contract to build the helium refrigerator and recovery facility of the superconducting conductor test facility (SUCCEX), KRW 6,308,000,000 excluding VAT, contract period December 26, 2025 to March 31, 2028.
Partnership
우주항공통합풍동센터 · 2026-01-16
Supply contract for an integrated wind tunnel apparatus, KRW 27,272,727,273 excluding VAT, contract period January 16, 2026 to October 31, 2029.
Partnership
Hanwha Aerospace (한화에어로스페이스) · 2026-03-09
Supply contract for a combustion chamber for high-pressure operation for the next-generation launch vehicle, KRW 4,527,345,450 excluding VAT, contract period March 9, 2026 to November 19, 2027.
Partnership
Hanwha Aerospace (한화에어로스페이스) · 2026-08-06
Supply contract to manufacture engine components for the Korean launch vehicle upgrade program (Nuri) flight models FM7 to FM11, KRW 53,500,000,000 excluding VAT (KRW 10,700,000,000 per flight model), contract period August 6, 2026 to November 30, 2029.
Partnership
Korea Aerospace Research Institute (한국항공우주연구원) · 2026-09-15
Contract for detailed design services to build a methane engine combustion test facility for the next-generation launch vehicle, KRW 4,490,909,091 excluding VAT, contract period September 9, 2026 to May 8, 2027.
Financials
FY2025 (separate), revenue KRW 36,790,989,927, operating income KRW -7,364,263,584, net income KRW -6,596,724,887, total assets KRW 113,784,541,586, total equity KRW 58,953,299,223
Financials
FY2024 (separate), revenue KRW 30,375,898,845, operating income KRW -14,065,489,282, net income KRW -15,440,727,453, total assets KRW 94,494,045,946, total equity KRW 35,833,869,272
Recognition
ISO 9001 and ISO 14001 certification, 2018
Recognition
ISO 45001 certification, 2019
Recognition
Inno-Biz (technology-innovative SME) selection, 2022
Recognition
AS9100 Rev.D aerospace quality management system certification, 2023
Recognition
KSPC certification (welding), 2023
Recognition
Innovative product designation (food waste resource recovery equipment), 2023
Recognition
ASME Stamp U, U2 and PP, 2024